Ongoing site projects

Building 100

Renovation and extension of Building 100 to modernise CERN’s Main Workshop and support long-term technical and manufacturing activities.

Schedule: 2025 – 2029

Building 893 (CT2)

Extension of the CT2 cooling tower facility to support CERN’s cooling infrastructure and future operational needs.

Construction/renovation phase: September 2026 – May 2027

HL-LHC Vertical Cores

Construction of the HL‑LHC vertical cores, the final civil engineering component required to complete the new infrastructure supporting the High‑Luminosity LHC.

Construction phase: November 2026 – September 2027

Prévessin site entrance

A redesigned entrance combining security, green spaces and soft mobility.

Construction phase: 2027

Building 889 (BA80)

A renovation project to preserve and strengthen a strategic access and technical services facility.

Construction phase: 2026 – 2027

Building 41 Retention Basin

Conversion of a decommissioned drinking-water storage tank into a stormwater retention basin to improve stormwater management and resilience to heavy rainfall.

Schedule: June 2026 – December 2026

Building 376-377-378

Renovation of the façades to improve performance, extend service life and enhance the technical complex.

Construction phase: September 2026 – July 2027

Building 738 (IBDRS)

Upgrading the ISOLDE facility to improve reliability, accessibility and long-term operation.

Construction phase: 2026 – 2027

Building 3189 (SA18)

A new multidisciplinary research facility dedicated to superconducting RF technologies and accelerator components.

Construction phase: 2026 – 2031

Building 754 (HI-ECN3)

Upgrading CERN’s North Area with a new experimental facility for the SHiP programme and future particle physics research.

Construction phase: 2028 – 2030