Frontpage

  • Regaining Storage Capacity: A Structured Tidy-Up Campaign at CERN

    Regaining Storage Capacity: A Structured Tidy-Up Campaign at CERN

    The Storage service offers short- and long-term central storage of material and equipment via the EDH SIT document. SCE department is responsible of space optimization (~10’000 m2), handlings (inbound and outbound, including B.947) and registration in CERN’s Asset Management System. In 2022, connected to CERN’s Masterplan 2040, a Storage Management Roadmap was developed defining long-term…

  • The cafeteria in B864 in Prévessin will reopen in November

    The cafeteria in B864 in Prévessin will reopen in November

    The renovation of the cafeteria in B864 is underway to revamp and enhance the dining space, aiming to provide employees and visitors with a welcoming look and feel. The works include flooring, ceiling painting, electrical installations, HVAC system upgrade, furniture arrangement, carpentry, and asbestos treatment in the kitchen area. The opening is scheduled in early…

  • Updates on the Consolidation programs in Prévessin !

    Updates on the Consolidation programs in Prévessin !

    In Buildings 927 and 904, new roofs and smoke extraction systems have been installed, along with significant improvements in the ventilation system of the welding workshop in 904. B864 is undergoing a full renovation of its sanitary facilities. Simultaneously, the foul water buried network has been upgraded to ensure proper waste management. Additionally, the lighting…