B777

  • Building 777 will provide office space for ~475 people, lab and workshop space, meeting rooms for the ATS Sector and a large restaurant.
  • It will be placed near the Prévessin Site entrance.
  • Total gross area of approximately 13,000 m2.
  • Beneficial occupancy: 2027.

Strategic objectives

  • Develop a building with an architectural quality that surpasses the existing feel of an industrial and laboratory in which CERN staff and users truly feel at home and happy to work.
  • Construct an environmentally friendly and state-of-the-art building; aiming towards net zero carbon, considering embodied and operational carbon.
  • Optimize and adapt accessibility, mobility and services to a larger population of the Prévessin site.
  • Obtain appropriate levels of energy, sustainability and health & safety certification.
  • Balance the use of the two main sites (Meyrin/Prévessin) and thus reduce the pressure on the Meyrin site.
B777